Planningby approved plans
9am to 6pm Mon to Fri
[email protected]

Free planning check

Free Kensington and Chelsea planning permission check

Check in 23 seconds whether your Kensington and Chelsea project needs planning permission, and what the council has approved near you. £995 planning drawings, paid only when the council approves. Council and Portal fees are paid separately at submission.

Step 1 of 3

What can you build at your address?

We’ll send your check summary here.

About the planning data

Checked against 20.6 million UK planning applications on file across 420 planning authorities. Approval rates from 2,343,419 decisions we classified across 181 councils in England.

38

Conservation areas

over 3,800

Listed buildings


Kensington and Chelsea approval rates by project type

Historical approval rates in our archive, grouped by project type. These describe recorded decisions, not the chance of approval for your proposal. Checked against 20.6 million UK planning applications on file across 420 planning authorities. Approval rates from 2,343,419 decisions we classified across 181 councils in England.

Kensington and Chelsea, by project type
Project typeApproval rateDecided
Single-storey rear extension88%1,593
Two-storey rear extension88%178
Wraparound extension77%47
Side extension90%270
Loft conversion and dormer82%1,062
Rooflight92%1,447
Outbuilding and garden room87%247
Porch94%192
Garage conversion100%51
Basement90%3,371
Window and door93%4,500

A rate is only shown where at least 8 applications of that type were decided; smaller samples are shown as unknown. Withdrawn and undecided records are excluded. These figures cover all recorded years, including records without a year. Full Kensington and Chelsea approval rates.


Planning in Kensington and Chelsea

Start with the rules for your property, then compare projects like yours. Royal Borough of Kensington and Chelsea's planning register lets you check a neighbouring scheme's drawings, decision notice and conditions. A nearby approval can help you understand the council's approach, but different site constraints can change the outcome.

For a home in a conservation area, read the relevant conservation area appraisal alongside the Local Plan. For a listed building, check both planning permission and listed building consent. Use the council's current records to confirm the boundary and any Article 4 direction.


Planning issues to check before you apply

Use your drawings to show how the proposal addresses the site and the council's policies:

  • The extension's height, depth and position relative to neighbouring windows and boundaries.
  • Privacy, daylight and the amount of usable outdoor space left after the work.
  • Materials, roof form and any effect on the character of a conservation area or listed building.
  • Protected trees and any site-specific flood or basement constraints.
  • Conditions on earlier permissions that may restrict what you can build.

This is a checklist for the proposal, not a ranking of local refusal reasons. The council's decision notice explains the reasons for an individual refusal.


Kensington and Chelsea council resources

Authoritative Kensington and Chelsea planning sources you can cross-check:

Application guidance in Kensington and Chelsea

Kensington and Chelsea adopted its Local Plan 2024 in July 2024. Check that plan and the relevant conservation-area appraisal, then use the Local Validation List linked from the submission page; the council also directs basement applicants to separate basement guidance.

Sources reviewed . Check the source maps, wording and effective dates against your property and proposed work.

Application records to compare

Selected archive records, not a representative sample or a prediction for your address. The descriptions below are archive excerpts and may be shortened; read the original decision and plans before relying on them.

  • PP/25/02276 · Recorded refused (2025)

    Erection of a single storey infill extension to rear and changes to existing shopfront; installation of freestanding, metal framed, timber slatted bin and bi...

    Search the council register for PP/25/02276
  • CON/25/01141 · Recorded approved (2025)

    Details required by condition 8 (SuDS) of planning permission 24/06854 (Demolition of existing garage and side wing to create two storey extension featuring...

    Search the council register for CON/25/01141

Compare the property type, works and application route. A scheme involving flats or several alterations is not directly comparable to a simple house extension. Read the archive's coverage and limitations.


Prepare for your planning application


Questions about planning in Kensington and Chelsea

Do I need planning permission for my project in Kensington and Chelsea?

Some house extensions, loft conversions and outbuildings can use permitted development rights in Kensington and Chelsea, but size alone does not establish eligibility. Check the property type, previous extensions, planning conditions and the rules for the proposed work. Householder rights do not apply to flats. Conservation areas and Article 4 directions restrict particular rights; they do not automatically require an application for every change. Listed building consent is a separate requirement for works affecting a listed building's special interest.

How long does Kensington and Chelsea Council take to decide a planning application?

The usual statutory period for a householder planning application is 8 weeks from a valid application, unless a longer period is agreed. This is a decision period, not a measured average for Kensington and Chelsea. Preparing drawings and validation take additional time. Larger home extension prior approval has a 42-day procedure; other prior approval routes have different periods.

What is the planning approval rate in Kensington and Chelsea?

It depends on the project type. 88% of 1,593 decided single-storey rear extension applications in Kensington and Chelsea were approved. 82% of 1,062 decided loft conversion and dormer applications in Kensington and Chelsea were approved. Checked against 20.6 million UK planning applications on file across 420 planning authorities. Approval rates from 2,343,419 decisions we classified across 181 councils in England. Every project type is on the Kensington and Chelsea approval rates page.

Are there Article 4 directions in Kensington and Chelsea?

Check Royal Borough of Kensington and Chelsea's published directions for your address and proposed work. An Article 4 direction removes only the permitted development rights specified in that direction, within its defined area. Its map, wording and effective date matter. It does not mean every alteration needs a full planning application.

Read the official guidance on when permission is required, listed buildings and conservation areas and planning decision periods.


Approval rates are computed from 2,343,419 decided applications across 181 councils, published by each council. Local reference counts last reviewed 11 April 2026. The free check is guidance from the public record, not a council decision.